Schematic diagrams Connector and Terminal funciton Repair procedures Removal 1. Disconnect the negative battery terminal.
Schematic diagrams Connector and Terminal function Repair procedures Removal [Floor Console Tray] 1. Disconnect the negative battery terminal.
C
Repair procedures Inspection 1. Measure the resistance between the terminals. 2. measured resistance is not within specification, the blower resistor must be replaced. (After removing the resistor) (1) Pin No 1.